Eight ways recycling systems fail

A short field model for diagnosing why a recycling project is breaking — built from real European case studies.

By Pavan Kumar Mylapalli

Recycling systems fail in patterned ways. After enough teardown reports, the same eight modes keep appearing.

  1. No end market. The material is collected and sorted but nobody buys it.
  2. Single-customer over-reliance. One offtake contract represents most of the revenue. When it walks (see Northvolt / BMW), the plant follows.
  3. Contamination upstream. The collection model lets unsortable material into the stream; the MRF cannot recover the loss.
  4. Scaling failure. Pilot worked at 1 GWh. The 16 GWh line never stabilised. The chemistry didn't change — the schedule and the financing did.
  5. Regulatory drift. The product spec was legal at design, illegal at launch.
  6. Energy or feedstock price shock. The unit economics depend on a price band the market has already left.
  7. Operator capability gap. Equipment installed; workforce never trained to keep it inside its operating window.
  8. Optimism in the model. The financial case assumes 92% uptime in year one. Nobody has ever achieved that in year one.

Module 9 of Inside Recycling walks through how to run a pre-mortem before committing capital.