Recycling systems fail in patterned ways. After enough teardown reports, the same eight modes keep appearing.
- No end market. The material is collected and sorted but nobody buys it.
- Single-customer over-reliance. One offtake contract represents most of the revenue. When it walks (see Northvolt / BMW), the plant follows.
- Contamination upstream. The collection model lets unsortable material into the stream; the MRF cannot recover the loss.
- Scaling failure. Pilot worked at 1 GWh. The 16 GWh line never stabilised. The chemistry didn't change — the schedule and the financing did.
- Regulatory drift. The product spec was legal at design, illegal at launch.
- Energy or feedstock price shock. The unit economics depend on a price band the market has already left.
- Operator capability gap. Equipment installed; workforce never trained to keep it inside its operating window.
- Optimism in the model. The financial case assumes 92% uptime in year one. Nobody has ever achieved that in year one.
Module 9 of Inside Recycling walks through how to run a pre-mortem before committing capital.